Solomon Islands

Komarindi Hydropower Station, Solomon Islands

Client

Solomon Islands Electricity Authority

Sectors

Water
Energy

We designed a greenfields hydropower station for the Solomon Islands.

This was to be constructed in a remote jungle site, 20km inland from Honiara. 

The project was progressed through feasibility, and then detailed design and documentation.

Services provided:

  • Prefeasibility study
  • Feasibility study
  • Full geotechnical investigations
  • Topographic survey
  • Detailed design of:
    - 30km of access road in mountainous terrain
    - 9km intake tunnel
    - the weir, intake and desanding basin, including physical model testing
    - penstocks
    - the 8 MW power station
  • Contract documentation
  • Tender process management